The 2 seem correct IMO.The word "allocation" means-
1. A share set aside for a specific purpose
2. The act of distributing by allotting or apportioning; distribution according to a plan
But when we are entering the actual work done, we doing neither of this. Therefore the name of the GUI should be changed to Real Work logging
(BTW the word "allocation" is used correctly in resource allocation to projects)
It is designed this way ! They is a control (sum is hilighted in RED if over the capacity of the resource) but no blocking.Issue#2: The project allows us to enter more than 24 hours in a day, although the resource is configured as FTE=1.
(see attached screenshot, titled WorkDone-1)
Desired: Never allow entry of more than (FTE x 24) hours.
For example, if the resource has FTE=2, then do not allow entry of more than 48 (= 2 x 24) hours.
(It is physically impossible for the resource to put up those many hours!)
How do you expect that projeqtor guess it is a mistake (ProjeQtOr cannot reBut the extra hours were added by mistake, so ProjeQtor should have ignored the last entry.
Please Log in or Create an account to join the conversation.
The 2 seem correct IMO.The word "allocation" means-
1. A share set aside for a specific purpose
2. The act of distributing by allotting or apportioning; distribution according to a plan
But when we are entering the actual work done, we doing neither of this. Therefore the name of the GUI should be changed to Real Work logging
(BTW the word "allocation" is used correctly in resource allocation to projects)
It is designed this way ! They is a control (sum is hilighted in RED if over the capacity of the resource) but no blocking.Issue#2: The project allows us to enter more than 24 hours in a day, although the resource is configured as FTE=1.
(see attached screenshot, titled WorkDone-1)
Desired: Never allow entry of more than (FTE x 24) hours.
For example, if the resource has FTE=2, then do not allow entry of more than 48 (= 2 x 24) hours.
(It is physically impossible for the resource to put up those many hours!)
How do you expect that projeqtor guess it is a mistake (ProjeQtOr cannot read your mind - not yet)But the extra hours were added by mistake, so ProjeQtor should have ignored the last entry.
No, because in most cases actual behavior is best :Desired: When an entry is deleted, the GUI should revert to the originally assigned hours (in our case, 24 hours)
Please Log in or Create an account to join the conversation.
Please Log in or Create an account to join the conversation.
En poursuivant votre navigation, vous acceptez le dépôt de cookies tiers destinés au bon fonctionnement et à la sécurisation du site (gestion de session, reCaptcha) et à une analyse statistique anonymisée des accès sur notre site (Google Analytics). Si vous vous inscrivez, les informations que vous fournirez ne seront jamais divulguées à un tiers sous quelque forme que ce soit. En savoir plus
Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.
Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.